YANING Clean Room Transfer Window Stainless Steel Double Layer Dynamic Pass Through Box for Lab
Product Description
Cleanroom Pass Box is an auxiliary device for clean room. It is mainly used for transferring small
articles between clean areas or between clean and non-clean areas. Through the pass box, the clean room
door opening frequency can be reduced and the pollution of clean areas can be minimized. To reduce dust
particulate caused by the goods moving in and out, the purified air from HEPA filter spay on the goods in
different direction through rotary nozzle. It can get rid of dust particulate efficiently.
Applicable to semiconductor, microelectronics, electronic technology, optical instruments, chemicals,
food and other industrial and scientific research.
Detailed Photos
Working Principle
A Dynamic passbox includes HEPA filter, a fan and a return air grille. There is a ventilation gap between the inner liner and the outer frame of pass box. When the fan inside pass box blows, it sends air to HEPA filter.The filter clean air enters the inner space of passbox, dilutes and filters the air inside.Then it passes through the return air grille, circulates to the fan, then goes through HEPA filter. The air is sent into the inner space and the cycle continues until the surface of the conveyed item is purified.
Dynamic Pass Box Features:
Because of small size, small circulating air volume of pass box, the purification effect can be achieved only by the inside air circulation. lt does not need air outside.There is no great positive pressure or negative pressure difference.The function of the dynamic pass box only allows the passed items to stay for a while. Laminar airflow design is used in pass box.Up-feed and down-return mode allows unidirectional flow hoods and reduces the turbulent airflow. Dynamic pass box has double door interlocking system. Two doors cannot be opened simultaneously, which prevents cross-contamination during items transfer. Besides, dynamic pass box is made of stainless steel,which has good corrosion resistance.The smooth surface of the stainless steel pass box is good for maintaining cleanliness in cleanroom.
Product Structure
* With G4 and H13 HEPA filter two level filtration to ensure the purification class;
* Electromagnetic interlock system prevents the doors from opening before the air shower cycle is completed, protecting the cleanroom from cross-contamination
* Door locks automatically release in the event of a power outage or if one of the Emergency Exit buttons are depressed
* Shower time and door interlock duration can be programmed using the touchscreen control panel
* Air nozzles can be adjusted to redirect streams of air
* Energy-efficient LED lighting includes motion-activation
* Standard of the modular design, make field assembly faster and more convenient maintenance.
Product Parameters
|
|
Model
|
YN-ZJC-01
|
YN-ZJC-02
|
YN-ZJC-03
|
External size(mm)
|
680*580*1100
|
780*680*1200
|
980*880*1400
|
Internal size(mm)
|
500*500*500
|
600*600*600
|
800*800*800
|
Noise
|
<65 dB (A)
|
<65 dB (A)
|
<65 dB (A)
|
U15 ULPA filter size(mm)
|
283*301*93*1pcs
|
383*401*93*1pcs
|
583*601*93*1pcs
|
Filter Efficiency
|
99.95%@0.3µm
|
99.95%@0.3µm
|
99.95%@0.3µm
|
Fan Power(W)
|
195W*1pcs
|
170W*1pcs
|
170W*1pcs
|
Sterilizer Power(W)
|
6W*1pcs
|
8W*1pcs
|
15W*1pcs
|
LED Lamp Power(W)
|
6W*1pcs
|
6W*1pcs
|
12W*1pcs
|
Interlock Type
|
Mechanical interlock, Electromagnetic interlock
|
Air Velocity
|
|
Clean Level
|
|
Power
|
|
Application
Successful Project
Certifications
Packaging & Shipping
Company Information
Dongguan Yaning Purification Equipment Co., Ltd
YANING was established in 2011, located in Dongguan City, Guangdong. We are a professional manufacturer of air purification equipment as well as purification project solution provider, also an ISO 9001 national certified high-tech enterprise.
We have more than 100 models covers several major categories including modular clean room, cleanroom equipment like cleanroom air shower for person & cargo, cleanroom pass box, clean bench, FFU fan filter unit, laminar air flow ceiling etc.; modular operating room, operating room wall panel, stainless steel hand wash sink, stainless steel cabinet etc.; Air filter ranged from primary level to medium and high efficiency level such as plate pre filter, bag medium filter, v-bank hepa filter, etc. Our products have been widely used in hospital, health care, electronics, food processing, precise instruments, aerospace, automobile manufacturing industry and so on.
Welcome to inquire any products or services at any time!
Exhibiton
FAQ
1. How can we guarantee quality?
Always a pre-production sample before mass production;
Always do final test and inspection before shipment;
2.What can you buy from us?
1) Modular clean room&clean room equipment like cleanroom air shower, cleanroom pass box, FFU Fan filter Unit, BFU, laminar flow ceiling, Clean Bench, Clean Booth, etc
2) Hospital Operating Room Supporting Equipment, like modular operating room, operating room wall panel, stainless steel cabinets, Laminar Flow Ceiling, Socket box for OT room, OT room intelligence Panel, stainless steel hand wash sink, all kinds of hermetic doors, operating room etc
3) Air Filter, such as Plate pre filter, F5-F9 Medium Pocket Filter, V-bank hepa Filter, Pleated HEPA Filter, Activated carbon filter, Gel Seal HEPA Filter, and High Temperature Resistant HEPA Filter etc.
4) Air Conditioning and Ventilation Terminal Equipment: Air Vent Louver Grille Series and Regulating Valve and Fire Damper
3. Why should you buy from us not from other suppliers?
YANING brand clean room equipment: cleanroom air shower, cleanroom pass box,clean bench,FFU fan filter Unit ,softwall clean room; YANING brand Air filters:HEPA,pre-filter,pocket filter,V-bank hepa filter all passed ISO14001, ISO9001, TUV, ROHS, CE,UL test.
Best price and service,each product will follow strict facty test.
4. What services can we provide?
Quality guarantee for core components for 1 year
Online technical support for assembly and after-sales service
Language Spoken:English and Chinese
5. What's our payment term?
50% deposit after PI confirmed and 50% balance TT in advance before shipment