Customization: | Available |
---|---|
Application: | Precision Electronic Industry, Power Industry, Pharmaceutical,Food Industry, Precision Industry, Clean Room |
Certification: | CE, ISO, RoHS |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Automatic Door Air Shower Video Automatic Door Air Shower BasicsAir showers are specialized enclosed antechambers which are incorporated as entryways of cleanrooms and other controlled environments to reduce particle contamination. Air showers utilize high-pressure, HEPA- or ULPA-filtered air to remove dust, fibrous lint and other contaminants from personnel or object surfaces. The forceful cleansing of surfaces prior to entering clean environments reduces the number of airborne particulates introduced.In the original air shower room on the basis of the abolition of the door closer, the impleme ...
2.Automatic Door Air Showers features:
Air showers are specialized enclosed antechambers which are incorporated as entryways of cleanrooms and other controlled environments to reduce particle contamination. Air showers utilize high-pressure, HEPA- or ULPA-filtered air to remove dust, fibrous lint and other contaminants from personnel or object surfaces. The forceful cleansing of surfaces prior to entering clean environments reduces the number of airborne particulates introduced.
In the original air shower room on the basis of the abolition of the door closer, the implementation of the two doors fan linkage lock, infrared induction automatic door opening system, reduce contact and pollution sources, to further enhance the level of purification process, from the real sense to achieve full automation.
- Automatic Sliding Door Air Shower Clean Room operation procedure:
1,15 cm away from the sensor, the sensor lights the green light, the door automatically open.
2,People enter the air shower room, the door automatically closed.
3,Double doors closed, automatic induction blowing.
4,After blowing, people leave from the door, the door automatically closed.
Product type no# | YN-CAS-2000 |
Dimensions | W2000*L2000*H2430MM |
Air shower area size | W1500*L1800*H1980MM |
Wind speed at the spout (m/s) | 25-30M/S |
Number of nozzles | 36 PCS |
Main material of the box | 1.0MM cold-rolled plate, surface electrostatic paint bright white or 304 stainless steel |
Door material | SUS304 stainless steel |
Base plate | SUS304 stainless steel |
High speed filter size | 610*610*70MM*4pcs |
Fan power (W) | 550*4 |
Power supply voltage | 380V50HZ |
Top | LED *2 pcs |
Company Information
Dongguan YANING Air Purification Equipment Manufacturing Co., Ltd. is a professional manufacturer of air purifying products. YANING specializing in producing person/cargo Air Shower, Pass Box, Clean Bench, Fan Filter Unit (FFU), HEPA filter air outlet, clean bench, clean room and hospital operating room supporting equipment.
YANING provide advanced, high quality products and perfect technical service to various industry applications, includes food, medicine, medical products production, laboratory, semiconductor production, biochemical technology, biotechnology, precision machinery, pharmaceuticals, and operating rooms in hospitals.
We are ISO9001:2015 certified company and our product passed CE, UL certification. YANING products are spreading throughout Asia, Europe, America, and Africa. No matter where you are, we are always at your side. You can trust us as long-term partner: YANING have ample products to satisfy your any demand from standard equipment and air filter to custom made purification equipment.
YANING insists on improving purifying equipment and air filter in order to reduce the work and maintenance cost. It let customer gain the steady efficiency and saves money, optimizing your project at the same time.
products:
1.FFU ,air shower room ,cargo air shower ,HEPA filter ,Laminar flow clean bench ,pass box ,clean booth medical wash hand sink and Laminar flow ceiling ,all kinds of OT room equipments so on
2.primer,middle and HEPA filter ,sub-high efficiency filter
3. undertake 100-300 thousand class level clean room design and construction of the project commission inspection and maintenance.